Narrow aisle storage
Aisle width, mast or scissor envelope, and free lift decide whether a mobile aerial work platform can travel loaded. Write the tightest aisle, not the average.
SOURCING SUPPORT
Share aerial work platform type, rated capacity, site geometry and quantity so factory replies sit on one written brief.
FREE review of load, lift height, pit or dock inputs, quantity and destination
Eligible first orders may receive up to 3%
Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements.
Application to RFQ
Building and handling conditions change an aerial work platform lift specification. This page turns those conditions into purchase fields. It is not a gallery of finished installs we performed.
Nameplate capacity is not application load. Electric versus another listed power is a site choice, not a universal ranking. Equipment price is not installed cost.
| Field | What the buyer writes | What each factory must echo | Common mismatch |
|---|---|---|---|
| Rated capacity | lb or kg at a stated load center | Same basis, same attachment assumption | Bare nameplate without load center |
| Lift height | in or mm plus lowered height | Travel that clears the task, not a catalog max only | Ignoring lowered height in a low door |
| Power | V, phase, Hz or shop air pressure | The supply you actually have | Three-phase quoted into a single-phase room |
| Site geometry | Aisle width, pit depth, dock height | Machine envelope that fits those numbers | A different model series used as proof of fit |
| Scope | Machine only, or named extras | Freight, pit, anchors, commissioning split | One blended number |
Read the units note before you copy a public specification page into the brief. A public dock-leveler page that lists lb capacity with ft of platform and in of lip is a unit dictionary, not a promise that this desk already bought that machine.
Warehouse procurement managers usually fail the first pass when aisle width, pallet size and floor loading are left for a later call. Facility engineers usually fail it when three-phase supply is assumed and the room only has battery charging. Importers fail it when destination and quantity arrive after the factory already priced a different duty cycle. Write those items once so aerial work platform lift replies can be read on one sheet.
If the building will share a charging room, add battery voltage and charger location. If the platform will sit beside a pit, add pit depth even when you think you are only buying a mobile unit. If the task is outdoor yard work plus indoor rack access, say so; a single catalog photograph cannot carry both envelopes. Aerial Work Platform Sourcing will not invent a missing measurement to close the row.
We will restate product, quantity and destination after you send them. No factory identity is implied by submitting the form.
Request Factory Quotes